Selecting a UPS is more than choosing a kVA rating. These are the items a complete specification covers, with links to how each is decided.

UPS cabinets being selected for a data center

The specification checklist

CriterionWhat to settle
CapacityLoad, losses, growth, kW and kVA, output power factor. See UPS sizing example
TopologyStandby, line-interactive or double-conversion. See UPS topologies
RedundancyN+1, 2N or block redundant, matching the tier target. See redundancy explained
EfficiencyAt the expected loading, including any eco-mode and its trade-offs
BatteriesChemistry, autonomy and footprint. See battery sizing and lithium-ion vs VRLA
Input characteristicsHarmonic distortion and input power factor. See harmonics
BypassStatic and maintenance bypass arrangement
Generator compatibilityBehaviour on generator supply. See generator sizing
ScalabilityModular growth without shutting down the load
MonitoringProtocols and integration with the facility monitoring system. See DCIM
ServiceSupport, spares and response times
StandardsThe applicable UPS performance standard (IEC 62040 series) and test evidence

How to use it

  1. Size the capacity and redundancy first, since they decide the module count.
  2. Write the specification so that vendors quote the same basis: load, power factor, efficiency points and autonomy.
  3. Compare total cost of ownership over the system's life, not only the price.
  4. Check factory test and witness requirements. See FAT, SAT and IST.

Run your numbers in the UPS sizing calculator.

Written by the Vision Matrix Institute editorial team. Worked examples use stated, illustrative assumptions; check them against your project data, the applicable standards and manufacturer datasheets before use.

Frequently Asked Questions

What are the key UPS selection criteria?

Capacity (kW and kVA) and output power factor, topology, efficiency at the expected load, redundancy arrangement, battery type and autonomy, input harmonics and power factor, bypass arrangement, scalability, monitoring and service support.

Should I size by kW or kVA?

Both. Size from the load in kW, check kVA, and confirm the UPS's rated kW at the load power factor from the datasheet.

Why does efficiency at part load matter?

UPS systems often run well below their rating in redundant configurations, so efficiency at the expected load, not at full load, decides running cost.

What about service?

Maintenance support, spare parts availability and response times matter over the life of the system and should be part of the selection.

Want to learn this properly?

This topic is covered in depth in our Electrical Design – Data Center Specialist program.

Ask us on WhatsApp

Learn to do this on a full project in the Electrical Design – Data Center Specialist program, or read the data center design guide.

Book Free Demo